Why should I want a screw piling report? Postech Winnipeg Piling Reports

So you are building a deck and for now it’s just a deck you are building.  What you might not realize is that in just a few short years your backyard ambitions will have grown and you’ll soon be planning to add a screened room, four season sunroom, gazebo or pergola or even a monsterously heavy hot tub to your little old deck.

You’re in luck!  Because you chose a Postech Thermal Pile foundation, your professional and friendly installed provided you with a piling report which looks a little like the one below.

 Pile  Description of Pile Used

Depth of Pile

Hydraulic Pressure

Capacity Achieved

Safety Factor

1 3.5” diameter, 14” helix, 10’ length

10’

1,600 psi

8,597 lbs

2.1 to 3

2 3.5” diameter, 14” helix, 10’ length

10’

2,000 psi

10,970 lbs

2.1 to 3

Monitoring our hydraulic pressure during the last few inches of installation, we can consult our engineered allowable loads chart to determine the capacity of each pile.

Our piling reports come in particularly handy when you’re speaking with your permitting office to determine if you can build on your existing deck.

Although our piles are typically over capacity for most decks, if you do still require additional support – not a problem!  Just give us a call and with the temporary removal of a couple deck boards and one or two sections of railing, we can reach over and install additional piles right under your existing deck.

For a superior customer experience, please call Postech Winnipeg at 793-0653 or visit us at www.manitobascrewpiles.ca.  We proudly serve Winnipeg, rural Manitoba and Cottage Country.

About screwpiling

We install premium pile foundations which are guaranteed against movement due to frost heaving. Our piles are affordable and professionally installed according to torque, this means you get a perfect install every time! We proudly serve the Greater Winnipeg Area, Steinbach, South-East Manitoba and Interlake regions. Start off on a solid foundation with a Postech Thermal Piles, the most solid and stable piles ever designed.
This entry was posted in Screw Pile Engineering, Steel Piles and tagged , , , , , , , , , , , . Bookmark the permalink.

2 Responses to Why should I want a screw piling report? Postech Winnipeg Piling Reports

  1. robert roy says:

    Just wondering if your screw piles can be used when building a 3 foot high concrete retaining wall

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s