Tag Archives: Screw Piling Winnipeg

Winnipeg Screw Pile Tip #1 – AVOID SOIL ASSUMPTIONS

With over 20 years of “screw pile’ish” technology being used in and around Winnipeg, Manitobans have grown to be aware of what a screw pile / ground anchor is. Unfortunately Winnipeg was led to believe that screw piles should come … Continue reading

Posted in Manitoba Soils and Screw Piles, Screw Pile Engineering, Screw Piles, Torque Monitored Installation, Uncategorized | Tagged , , , , , , , , , , | Leave a comment

Piles Inside a Hotel? Call Postech!

Postech Installers have been on their fair share of “interesting” job sites but it was uniquely cool to drive through the front doors of a local hotel and navigate our way into the laundry room.   Our customer was tasked … Continue reading

Posted in Construction, Foundation Repair with Screw Piles, Manitoba Soils and Screw Piles, Piling, Screw Pile Engineering, Screw Piles, Screw Piles for Commercial Projects, Uncategorized | Tagged , , , , , , , , , , , , | Leave a comment

The Advantages of Choosing a Postech Winnipeg Screw Pile Foundation

A short presentation for consumers to highlight some of the key advantages customers enjoy when choosing a Postech Winnipeg screw pile foundation for their building project.

Video | Posted on by | Tagged , , , , , | Leave a comment

Postech Winnipeg Screw Piles a Year in Review

A slideshow of more than 100 images of Postech Winnipeg’s dedicated installation hard at work installing premium screw pile foundations for a wide range of building projects in Winnipeg and throughout Manitoba. Thank you to all our great customers who … Continue reading

Video | Posted on by | Tagged , , , , , , | Leave a comment

Installing 10′-6″ Helical Screw Piles for Sunroom in St Andrews Manitoba

Postech Winnipeg installation of 2.38″ diameter screw pile that is 10.5′ long with a 12″ helical for a sunroom project in St. Andrews, MB. Each screw pile is laser levelled to the perfect height for an efficient building process. Postech … Continue reading

Image | Posted on by | Tagged , , , , , , , | Leave a comment

Helical Screw Piles for Deck and Pergola in Winnipeg Manitoba – 24 Second Installation!

Q.)  How long does it take to install six helical screw piles for a deck and pergola? A.)  24 seconds (when time-lapsed) or just shy of 1.5 hours in real-time. If you want a solid foundation for your deck project, … Continue reading

Posted in Screw Piles and Decks, Screw Piles for Pergola, Steel Piles | Tagged , , , , , , , , , , , , , , , , , , | Leave a comment

Postech Winnipeg Gearing Up for Trade Shows

Yup, it’s March and so begins the trade show season.  This year Postech is proud to be included in three very exciting Winnipeg trade shows: Rona – Contractors Only Show – March 27th, 2012 at the Victoria Inn Home Expressions … Continue reading

Posted in Construction, Piling, Screw Piles, Steel Piles | Tagged , , , , , , , | Leave a comment